• Home
  • Photo News
  • News
    • NGO/CSO
    • Photo News
    • OrientalNews 7th Anniversary
    • Press Releases
    • World News
    • Nigeria News
    • Politics
    • Opinion
    • Sports
  • Interviews
  • SMEs
  • Law
    • Crime
  • Travel & Tours
    • Aviation
    • Tourism
  • Energy
    • Oil & Gas
    • Power
  • Business
    • Banking & Finance
      • Capital Market
      • Money Market
    • Pension
    • Insurance
    • Brands & Marketing
    • IT & Telecoms
    • Labour
    • Agriculture
    • Maritime
    • Property
    • Manufacturing
  • Regulators
    • Nigeria Bureu of Statistics
    • PENCOM
    • NAICOM
    • SEC
    • NSE
    • CBN
Facebook X (Twitter) Instagram
Thursday, July 23
  • About us
  • Terms of use
  • Privacy Policy
  • Disclaimer
  • Advertize here
  • Contact us
Facebook X (Twitter) Instagram
Oriental News Nigeria
NRS Tax campaign
  • Home
  • Photo News
  • News
    • NGO/CSO
    • Photo News
    • OrientalNews 7th Anniversary
    • Press Releases
    • World News
    • Nigeria News
    • Politics
    • Opinion
    • Sports
  • Interviews
  • SMEs
  • Law
    • Crime
  • Travel & Tours
    • Aviation
    • Tourism
  • Energy
    • Oil & Gas
    • Power
  • Business
    • Banking & Finance
      • Capital Market
      • Money Market
    • Pension
    • Insurance
    • Brands & Marketing
    • IT & Telecoms
    • Labour
    • Agriculture
    • Maritime
    • Property
    • Manufacturing
  • Regulators
    • Nigeria Bureu of Statistics
    • PENCOM
    • NAICOM
    • SEC
    • NSE
    • CBN
Oriental News Nigeria
Home»Energy»‘Stable power supply is work in progress’
Energy

‘Stable power supply is work in progress’

By orientalnewsngDecember 29, 2014No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Source-Nation

rp_power-line-150x150.jpg

Managing Director/Chief Executive Officer, Ikeja Electric (IE) (formerly Ikeja Electricity Distribution (IKEDC), Engr. Abiodun Ajifowobaje, has said the country’s transition to uninterrupted power supply is work in progress.

He expressed confidence that the advent of privatisation in the power sector will deliver the expected dividend. Ajifowobaje who spoke with The Nation, however cautioned Nigerians that they should not be unmindful of the time it will take the country to reach the desired levels of gas availability, infrastructure, human capital and financial backing, which are all critical ingredients for a complete transformation of the sector.

According to him, so far, the best thing that has happened to the power sector is its privatisation. This is because prior to privatisation, the industry was in need of fresh investments to boost capacity and supply. Privatisation, the IE boss explained, has given the sector a boost, especially with the introduction of private sector initiative, including private funding, which he noted, is completely changing its operational framework all over the country.

He however said the persistent problem of vandalism of electrical equipment constitutes a major challenge to timely realisation of the goal.

Vandalism, he further said, is like a virus which is destroying the power industry in Nigeria with colossal socio-economic implication.

“It throws communities into darkness and hit the commercial and industrial activities of the affected areas. “We should work together to stop the activities of vandals and those that specialise in energy theft and destruction of power facilities and installations,” he said.

He recalled that one year ago when IE took over the electricity distribution under the privatisation scheme, there were 42 transformer substations out of circuit due to vandalism. To curb or reduce this incident from further occurrence, he said that his firm had to engage in public enlightenment on the effect of vandalism. This has also been further boosted by way of partnering with security agencies in Lagos State in tackling the menace, as well as being in constant touch with the community leaders and propping them to assist in securing the equipment in their domains.

Share this:

  • Share
  • Email a link to a friend (Opens in new window) Email
  • Tweet
  • Share on Reddit (Opens in new window) Reddit
‘Stable power supply is work in progress’ featured
orientalnewsng

Related Posts

Sahara Group Engages Media On Professionalism, Investigative Journalism At Asharami Square 3.0

July 22, 2026

Nigeria Concludes Commercial Oil Bid Process With 37 Firms Winning Oil Fields

July 22, 2026

AEC Seeks Global Investment In Venezuela’s Energy Sector 

July 22, 2026

Leave A Reply Cancel Reply

The latest
  • Sahara Group Engages Media On Professionalism, Investigative Journalism At Asharami Square 3.0
  • NAICOM Applauds Senate On Passage Of Insurance Regulatory Commission Bill
  • NYSC Announces 2026 Batch ‘B’ Stream II Orientation To Start In August 
  • NYSC To Strengthen Youth Involvement In Economic Transformation 
  • SIFAX Group Charges Young Nigerians To Lead Africa’s Blue Economy Future
  • Paras Energy Funding SPV Plc Lists N15.00Bn Bond On FMDQ Platform 
  • FMDQ Approves Quotation Of TeleAfrica Communications Ltd’s N3.31Bn CP On Platform 
  • Court Jails 12 For Naira Abuse
  • Alleged N1.35b Fraud:  Absence Of Defence Counsel Stalls Trial Of Lamido, Sons
  • Heirs Insurance MD Fayemi Calls For Strong Policy Direction To Address Nigeria’s Housing Challenge
Categories
Quick Links
  • About us
  • Terms of use
  • Privacy Policy
  • Disclaimer
  • Advertize here
  • Contact us
Facebook X (Twitter) Instagram YouTube LinkedIn
Copyright © 2026 Oriental News Nigeria. All right reserved.

Type above and press Enter to search. Press Esc to cancel.