• Home
  • Photo News
  • News
    • NGO/CSO
    • Photo News
    • OrientalNews 7th Anniversary
    • Press Releases
    • World News
    • Nigeria News
    • Politics
    • Opinion
    • Sports
  • Interviews
  • SMEs
  • Law
    • Crime
  • Travel & Tours
    • Aviation
    • Tourism
  • Energy
    • Oil & Gas
    • Power
  • Business
    • Banking & Finance
      • Capital Market
      • Money Market
    • Pension
    • Insurance
    • Brands & Marketing
    • IT & Telecoms
    • Labour
    • Agriculture
    • Maritime
    • Property
    • Manufacturing
  • Regulators
    • Nigeria Bureu of Statistics
    • PENCOM
    • NAICOM
    • SEC
    • NSE
    • CBN
Facebook X (Twitter) Instagram
Wednesday, September 30
  • About us
  • Terms of use
  • Privacy Policy
  • Disclaimer
  • Advertize here
  • Contact us
Facebook X (Twitter) Instagram
Oriental News Nigeria
NRS Tax campaign
  • Home
  • Photo News
  • News
    • NGO/CSO
    • Photo News
    • OrientalNews 7th Anniversary
    • Press Releases
    • World News
    • Nigeria News
    • Politics
    • Opinion
    • Sports
  • Interviews
  • SMEs
  • Law
    • Crime
  • Travel & Tours
    • Aviation
    • Tourism
  • Energy
    • Oil & Gas
    • Power
  • Business
    • Banking & Finance
      • Capital Market
      • Money Market
    • Pension
    • Insurance
    • Brands & Marketing
    • IT & Telecoms
    • Labour
    • Agriculture
    • Maritime
    • Property
    • Manufacturing
  • Regulators
    • Nigeria Bureu of Statistics
    • PENCOM
    • NAICOM
    • SEC
    • NSE
    • CBN
Oriental News Nigeria
Home»Energy»Power»Aba Power Blames 50MW Power Loss To TCN Repairs
Power

Aba Power Blames 50MW Power Loss To TCN Repairs

By Orientalnews StaffFebruary 4, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

 

Uche Cecil Izuora

Aba Power Electric, has suffered about 50MW power loss daily from 9 am to 5 pm as a result of the ongoing scheduled one-week maintenance of the Transmission Company of Nigeria (TCN) facilities in Abia State.

But the DisCo says it is doing everything within its power to ensure that power is restored today to most of the areas affected by the outage.

“If the TCN had responded to our letter seeking permission to provide these areas with electricity generated from the 188megawatt Geometric Power Plant in the Osisioma Industrial Zone of Aba”, noted Edise Ekong, the Aba Power Brand and Communication manager, in a note to his team members, “areas like Opobo Road, Obingwa, Ikot Ekpene Road, Ukwa West, and East, among others, would not have been experiencing this level of outage”.

Other areas affected by the blackout include Aba City Centre, Ogbor Hill, Isiala Ngwa Local Government Area, Waterside, Umuode, and Ugwunagbo.

“If the TCN replies to our letter even right now, we will restore electricity to most of these areas within minutes”, Ekong continued.

“We apologise profoundly to our numerous customers for the delay in communications between the TCN and Aba Power which caused this outage, especially in this hot weather.

“Aba Power and its parent company, Geometric Power, have acted as proactively as possible”.

Though the Geometric Power Plant has enough capacity to generate and distribute the 100MW required in the Aba Ringfence which comprises nine of the 19 LGAs in Abia State, it imports electricity from the Niger Delta Power Holding Company of Nigeria (NDPHC) due to insufficient gas supply from the Nigerian National Petroleum Company Limited (NNPCL) and its business partner.

According to sources in the power utility who do not want their names in the media because they are not allowed to speak to the press on the matter, Aba Power pays over two billion naira (N2bn) monthly to the NDPHC which supplies electricity to Aba Power through the TCN.

Ugo Opiegbe, Aba Power Managing Director, has disclosed that the Geometric Power Group is making an arangement to obtain more gas supplies.

“Once we begin to receive more supplies to run our gas turbines, we will become more autonomous, that is, less dependent on the external environment, with all its caprices and volatilities”, Opiegbe told journalists recently.

“For now, we will continue to work closely with other electricity organizations in the interests of not just our customers in the Aba Ringfence but also the entire Nigerian people who benefit directly or indirectly from our work in Aba, the heart of Nigeria’s Indigenous manufacturing”.

 

Share this:

  • Share
  • Email a link to a friend (Opens in new window) Email
  • Tweet
  • Share on Reddit (Opens in new window) Reddit
Orientalnews Staff

Related Posts

26MW Independent Power Plant In Lagos Gets New Lease Of Life

September 30, 2026

Nigeria Pushes To Restore Stranded Capacity To Inject More Power To Grid Lines

September 23, 2026

Geometric Power Says Alternative Gas Supply Option To Boost Electricity Supply To Aba-Ring Fenced Area

September 22, 2026

Leave A Reply Cancel Reply

The latest
  •  AXA Mansard Deepens Insurance Penetration Through Renewed Campaign 
  • Lagos Will Sustain Security Of Life And Property- Sanwo-Olu
  • AIICO Unveils State-of-the-Art Learning And Conference Centre In Lagos 
  • Tinubu Celebrates Blue Economy Minister On His Birthday 
  • BSN Nigeria Celebrates 82 Transformational Leaders
  • Presidency Equips 70 Media Personnel With Tools
  • Comptroller Mu’azu Assumes Duty At Customs Apapa Area Command
  • CIIN Partners With Insurance Meets Tech For 5th Edition To Deliver Value 
  • Nigeria Consolidates On Ports Modernization 
  • CBN Says Cybersecurity Investment Strategy Key To Secure Customers Data Protection 
Categories
Quick Links
  • About us
  • Terms of use
  • Privacy Policy
  • Disclaimer
  • Advertize here
  • Contact us
Facebook X (Twitter) Instagram YouTube LinkedIn
Copyright © 2026 Oriental News Nigeria. All right reserved.

Type above and press Enter to search. Press Esc to cancel.