• Home
  • Photo News
  • News
    • NGO/CSO
    • Photo News
    • OrientalNews 7th Anniversary
    • Press Releases
    • World News
    • Nigeria News
    • Politics
    • Opinion
    • Sports
  • Interviews
  • SMEs
  • Law
    • Crime
  • Travel & Tours
    • Aviation
    • Tourism
  • Energy
    • Oil & Gas
    • Power
  • Business
    • Banking & Finance
      • Capital Market
      • Money Market
    • Pension
    • Insurance
    • Brands & Marketing
    • IT & Telecoms
    • Labour
    • Agriculture
    • Maritime
    • Property
    • Manufacturing
  • Regulators
    • Nigeria Bureu of Statistics
    • PENCOM
    • NAICOM
    • SEC
    • NSE
    • CBN
Facebook X (Twitter) Instagram
Sunday, September 6
  • About us
  • Terms of use
  • Privacy Policy
  • Disclaimer
  • Advertize here
  • Contact us
Facebook X (Twitter) Instagram
Oriental News Nigeria
NRS Tax campaign
  • Home
  • Photo News
  • News
    • NGO/CSO
    • Photo News
    • OrientalNews 7th Anniversary
    • Press Releases
    • World News
    • Nigeria News
    • Politics
    • Opinion
    • Sports
  • Interviews
  • SMEs
  • Law
    • Crime
  • Travel & Tours
    • Aviation
    • Tourism
  • Energy
    • Oil & Gas
    • Power
  • Business
    • Banking & Finance
      • Capital Market
      • Money Market
    • Pension
    • Insurance
    • Brands & Marketing
    • IT & Telecoms
    • Labour
    • Agriculture
    • Maritime
    • Property
    • Manufacturing
  • Regulators
    • Nigeria Bureu of Statistics
    • PENCOM
    • NAICOM
    • SEC
    • NSE
    • CBN
Oriental News Nigeria
Home»Energy»Oil & Gas»Nigeria To Restart 19 Million Barrels A Day Oil Facility
Oil & Gas

Nigeria To Restart 19 Million Barrels A Day Oil Facility

By Orientalnews StaffApril 12, 2021No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Yemisi Izuora

The federal government is reviewing issues around the abandoned abandoned $1 billion Kaztec Engineering Limited (KEL) fabrication yard, located in Ilase village, Snake Island, Amuwo-Odofin Council, Lagos State.

The facility was designed to make it the first wholly indigenous engineering, procurement, fabrication, and offshore installation company to deliver complex offshore and onshore oil and gas projects until the operational challenges occurred.

An inter-ministerial committee drawn from the Department of Petroleum Resources (DPR), federal ministry of defence, ministry of finance, ministry of justice and the Nigerian National Petroleum Corporation NNPC, which was recently set up to review the compensatory contracts and other incentives has concluded its assignment and submitted its report to the Minister of State, Petroleum, Mr. Timipre Sylva, in Abuja.

Chairman of the Committee and Member of the Board of the Nigerian National Petroleum Corporation (NNPC), Senator Magnus Abe, described the assignment as sensitive.

The chairman explained that the federal government would not sit by and allow such humongous waste of resources on the project, stressing that aside the 3,000 jobs lost to the collapse of the facility, over $650 million had already been expended on the abandoned project.

Abe noted that the facility was to add over 19 million barrels to the national oil reserve before Addax Petroleum declared a force majeure on the project which has not been operational since 2015 due to contractual issues.

“This has been a very sensitive assignment. This committee was inaugurated 14 August last year and we sought an extension and we have finished our task, submitted our interim report. But we thought the public needed to know what is happening on this project.

“In keeping with that, we thought we needed a formal report. It is important that Nigerians realise what happened on this project. As we speak, this was a project that was to extract or add 19 million barrels to our existing reserves and would have been part of the daily national production.

“After that project was ready and everything was in place, contracts had been awarded and close to $1 billion had been invested in it, addax petroleum called a force majeure on issues that were totally unrelated to this particular project at hand,” he lamented.

The NNPC board member noted that the action put over 3,000 Nigerians out of work and wasted hard earned foreign currency that the country would have used for other things, adding that, “Nigerians will weep over what happened there,” when allowed to visit the site.

The committee chairman noted that Nigerians ought to know the extent of damage that was done not only to the indigenous oil company, but to the economic interest of the country.

He stated that not only were the workers there affected, but a lot of jobs that were supposed to be done in-country that would have been useful even in the execution of other projects, were still being done abroad.

“As a result of that, the entire investment of the Nigerian company went to waste, more than, 3,000 laid off, ships were abandoned and the entire investment collapsed.

“So, when the president got wind of it, he set up this committee to go and find out the way it could help revitalise that project so that it isn’t lost or wasted. This project should not be abandoned,” he explained.

In his remarks, the minister lauded President Muhammadu Buhari for the directive to investigate the matter that has lingered for six years, noting that justice will be done to all parties involved.

“It was the president that directed that we should look into this and I must say you have done a great job.

“We are here as independent arbiters to ensure that there’s justice in this industry, justice for the investors and justice for Nigerians and I am happy you have done a great job,” Sylva said.

He promised to ensure that the recommendations are forwarded to the president, saying Buhari will thereafter look at the issues and act upon the recommendations.

Share this:

  • Share
  • Email a link to a friend (Opens in new window) Email
  • Tweet
  • Share on Reddit (Opens in new window) Reddit
Orientalnews Staff

Related Posts

Nearly 40 people died near an oil pipeline in Nigeria after inhaling fumes; many are still being searched for

September 4, 2026

Marketers Requests Support To Deliver On CNG Initiative 

September 4, 2026

Fresh Concerns Over Global Oil Market After Iran Strike Reduces Vessel Movement Along the Hormuz

September 4, 2026

Leave A Reply Cancel Reply

The latest
  • NIA Unveils  Agricultural Insurance And Reinsurance Technical Committees*
  • Presidency Speaks On Ongoing FOI Act Case In US
  • First Bank Extends Support To SMEs
  •  Lagos Governor Delivers 7th Freedom Online Lecture Says Nigeria’s Democratic, Electoral System Evolved Since 1999
  • Stanbic IBTC Insurance Confirms Compliance With NIIRA 2025 Capital Requirements
  • CSCS Deepens Market Participation, Revises Selected Fees 
  • NAICOM Says Insurance Sector Moving From Intention To Action To Achieve Sustainable Growth 
  • From Shoprite to Uber: What Six Years of Corporate Restructuring Say About Nigeria’s Business Environment
  • Multi-Stakeholder Decarbonisation Hub Urgently Required In Nigeria To Accelerate Energy Transition 
  • Nearly 40 people died near an oil pipeline in Nigeria after inhaling fumes; many are still being searched for
Categories
Quick Links
  • About us
  • Terms of use
  • Privacy Policy
  • Disclaimer
  • Advertize here
  • Contact us
Facebook X (Twitter) Instagram YouTube LinkedIn
Copyright © 2026 Oriental News Nigeria. All right reserved.

Type above and press Enter to search. Press Esc to cancel.