• Home
  • Photo News
  • News
    • NGO/CSO
    • Photo News
    • OrientalNews 7th Anniversary
    • Press Releases
    • World News
    • Nigeria News
    • Politics
    • Opinion
    • Sports
  • Interviews
  • SMEs
  • Law
    • Crime
  • Travel & Tours
    • Aviation
    • Tourism
  • Energy
    • Oil & Gas
    • Power
  • Business
    • Banking & Finance
      • Capital Market
      • Money Market
    • Pension
    • Insurance
    • Brands & Marketing
    • IT & Telecoms
    • Labour
    • Agriculture
    • Maritime
    • Property
    • Manufacturing
  • Regulators
    • Nigeria Bureu of Statistics
    • PENCOM
    • NAICOM
    • SEC
    • NSE
    • CBN
Facebook X (Twitter) Instagram
Tuesday, July 8
  • About us
  • Terms of use
  • Privacy Policy
  • Disclaimer
  • Advertize here
  • Contact us
Facebook X (Twitter) Instagram
Oriental News Nigeria
  • Home
  • Photo News
  • News
    • NGO/CSO
    • Photo News
    • OrientalNews 7th Anniversary
    • Press Releases
    • World News
    • Nigeria News
    • Politics
    • Opinion
    • Sports
  • Interviews
  • SMEs
  • Law
    • Crime
  • Travel & Tours
    • Aviation
    • Tourism
  • Energy
    • Oil & Gas
    • Power
  • Business
    • Banking & Finance
      • Capital Market
      • Money Market
    • Pension
    • Insurance
    • Brands & Marketing
    • IT & Telecoms
    • Labour
    • Agriculture
    • Maritime
    • Property
    • Manufacturing
  • Regulators
    • Nigeria Bureu of Statistics
    • PENCOM
    • NAICOM
    • SEC
    • NSE
    • CBN
Oriental News Nigeria
Home»Energy»Power»NERC Issues Deadline For Integration Of Operations With SCADA/EMS
Power

NERC Issues Deadline For Integration Of Operations With SCADA/EMS

By Orientalnews StaffJune 19, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

 

Tunde Bakare

All grid-connected power generation companies have been mandated by the Nigerian Electricity Regulatory Commission (NERC) to fully integrate their operations with the national Supervisory Control and Data Acquisition/Energy Management System.

The deadline given by NERC is December 31, 2025, after which defaulters will face stiff financial penalties and possible disconnection from the national grid.

This directive is contained in a new regulatory framework titled “Order on the Mandatory Integration of Grid-Connected Generating Units into the New SCADA/EMS for the Nigerian Electricity Supply Industry”, and obtained from the Commission on Wednesday in Abuja.

The order seeks to strengthen real-time monitoring of the power grid, improve operational efficiency, enhance load dispatch, and reduce nationwide system disturbances by ensuring full visibility of electricity generation across the country.

The order signed by the NERC Chairman, Garba Sanusi, and Vice Chairman, Musiliu Oseni, took effect from May 22, 2025.

The national grid has in recent years experienced several collapses, often traced to inadequate coordination between generation, transmission, and distribution assets.

A functional SCADA/EMS, which acts as the central nervous system of grid operations, enables automated controls, timely fault detection, and live monitoring of generation output. However, many GenCos are still not fully connected to this system.

To address this, NERC’s new order compels power generators to install SCADA-compliant data acquisition devices, ensure compatibility with the Transmission Company of Nigeria’s protocols, and allow remote visibility by the Nigerian Independent System Operator.

The order read, “Pursuant to Section 12.2 of the Grid Code for the Nigeria Electricity Transmission System (the “Grid Code” or the “Code”), all the generation companies are mandated to provide real-time operational data to the Nigerian Independent System Operator through the SCADA/EMS to facilitate effective grid management.

“Section 20.16 further requires the Gencos to ensure seamless communication and data exchange with the Transmission Company of Nigeria Plc SCADA/EMS for accurate system monitoring, fault detection, and load dispatch.

“Section 20.16.1 of the Grid Code stipulates that SCADA Remote Terminal Units shall be required in all the control rooms of the System Operator and at the Off-taker’s boundary site and the generator’s control room for the transmission of signals and indications to and from the National Control Centre.”

It noted that Section 20.16.2 of the code further provides that interface cabinets shall be installed in the relevant control room, and the User shall provide and maintain wiring and signalling from the User’s Plant and Apparatus to the interface cabinet.

“The SCADA/EMS/System Telecommunications project being executed by the TCN has progressed substantially to a level that requires the integration of the power generation units to have a complete functional and efficient SCADA/EMS for the NESI.

“The order aims to, through the full integration of Gencos, enhance grid visibility and operational efficiency through real-time monitoring of grid operations to ensure compliance with the provisions of the Grid Code for the Nigerian Electricity Transmission System,” the NERC stated.

The commission thereby ordered as follows: “Mandatory Integration into the SCADA/EMS. Pursuant to Sections 12.2 and 20.16 of the Grid Code, all grid-connected GenCos shall integrate all the generating units in the plant onto the TCN SCADA/EMS no later than 31 December 2025.

“The integration shall include real-time data transmission of the following parameters: Active Power, Reactive Power, Frequency, Voltage, Status of Circuit breakers, and Fault alarms.” The document further provided many other details required from the Gencos and other operators in the sector.

Share this:

  • Share
  • Click to email a link to a friend (Opens in new window) Email
  • Tweet
  • Click to share on Reddit (Opens in new window) Reddit
Orientalnews Staff

Related Posts

Nigeria’s power sector: The way forward

July 8, 2025

DisCos ATC&C Loss Plunges Further In Q1, 2025- Report

July 4, 2025

EKEDC Strengthens Power Supply Through Strategic Infrastructure Upgrades 

July 4, 2025

Leave A Reply Cancel Reply

2025 OrientalNews Conference

0
Years
:
0
Months
:
0
Days
:
0
Hrs
:
0
Mins
:
0
Secs
The latest
  • Ecobank Drives Sustainable Education Ecosystem With Customer Value Proposition 
  • Nigeria Judiciary Called To Promote Confidence In Nigeria’s Capital Market
  • NCS, Others Engages International Airlines On Currency Declaration
  • Oby Ezekwesili Confirmed Keynote Speaker At 7th Penpushing Media Anniversary Lecture 
  • CBN Clarifies NRBVN Charges For Nigerians In Diaspora 
  • MultiChoice Nigeria To Pay $501, 340 Fine For Data Breach
  • NCC’s Digital Awareness Programme Wins 2025 Prize 
  • Nigeria’s power sector: The way forward
  • ViviaJets Says Private Aviation Key To Advancing Africa’s Oil And Gas Industry
  • Sahara Group Drives Dialogue On Gas As Catalyst For Africa’s Sustainable Future
Categories
Quick Links
  • About us
  • Terms of use
  • Privacy Policy
  • Disclaimer
  • Advertize here
  • Contact us
Facebook X (Twitter) Instagram YouTube LinkedIn
Copyright © 2025 Oriental News Nigeria. All right reserved.

Type above and press Enter to search. Press Esc to cancel.