• Home
  • Photo News
  • News
    • NGO/CSO
    • Photo News
    • OrientalNews 7th Anniversary
    • Press Releases
    • World News
    • Nigeria News
    • Politics
    • Opinion
    • Sports
  • Interviews
  • SMEs
  • Law
    • Crime
  • Travel & Tours
    • Aviation
    • Tourism
  • Energy
    • Oil & Gas
    • Power
  • Business
    • Banking & Finance
      • Capital Market
      • Money Market
    • Pension
    • Insurance
    • Brands & Marketing
    • IT & Telecoms
    • Labour
    • Agriculture
    • Maritime
    • Property
    • Manufacturing
  • Regulators
    • Nigeria Bureu of Statistics
    • PENCOM
    • NAICOM
    • SEC
    • NSE
    • CBN
Facebook X (Twitter) Instagram
Sunday, June 7
  • About us
  • Terms of use
  • Privacy Policy
  • Disclaimer
  • Advertize here
  • Contact us
Facebook X (Twitter) Instagram
Oriental News Nigeria
  • Home
  • Photo News
  • News
    • NGO/CSO
    • Photo News
    • OrientalNews 7th Anniversary
    • Press Releases
    • World News
    • Nigeria News
    • Politics
    • Opinion
    • Sports
  • Interviews
  • SMEs
  • Law
    • Crime
  • Travel & Tours
    • Aviation
    • Tourism
  • Energy
    • Oil & Gas
    • Power
  • Business
    • Banking & Finance
      • Capital Market
      • Money Market
    • Pension
    • Insurance
    • Brands & Marketing
    • IT & Telecoms
    • Labour
    • Agriculture
    • Maritime
    • Property
    • Manufacturing
  • Regulators
    • Nigeria Bureu of Statistics
    • PENCOM
    • NAICOM
    • SEC
    • NSE
    • CBN
Oriental News Nigeria
Home»Energy»Oil & Gas»Alaoji 405MW Power Plant Shut Down As TotalEnergies Declare Force Majeure
Oil & Gas

Alaoji 405MW Power Plant Shut Down As TotalEnergies Declare Force Majeure

By orientalnewsngJanuary 10, 2022No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
Yemisi Izuora
TotalEnergies EP Nigeria Limited has declared a Force Majeure resulting from its NOPL Line vandalization at KP41 on January 7, 2022.
According to TotalEnergies EP Nigeria Limited in a letter to the Niger Delta Power Holding Company Limited (NDPHC), “NOPL pipeline was vandalized on 7th January 2022 at KP41 Alaoma Etche Cluster.
The Line Block Valve at KP38 was closed to isolate the sabotage point and depressurization of the line, this will affect gas supply to Alaoji (Power Plant) until further notice.
As a result of this development, TotalEnergies EP Nigeria Limited stated that “Gas supply to Alaoji Power Plant was suspended due to this unfortunate event. Preliminary investigation to determine the extent of the damage is ongoing, and repair works shall commence as soon as feasible.”
The Niger Delta Power Holding Company (NDPHC) Limited also confirmed the plant shut down due to the incident.
It will be recalled that Omotosho NIPP was shut down last month when Nigeria Gas Company (NGC) due to system wide curtailment of all gas shippers (gas producers/off takers) by Nigeria Gas Company (NGC) “to forestall the imminent collapse of the gas grid.” NGC said at the time that the Trans-Forcardos Pipeline (TFP), belonging to NGC was breached on December 17, 2021.
That breach led to the deferment of about 250 million standard cubic feet of gas, MMscfd of gas from the Pipeline Network, a situation that brought the Network Pressure to abysmal levels, thereby triggering an emergency.
The curtailment impacted operations of Niger Delta Power Holding Company (NDPHC) Limited negatively with Omotosho NIPP being shut down and gas supply to GEREGU NIPP and Ihovbor NIPP also limited thus leading to part load or low generation from these available power plants.
The Management of NDPHC however assured its customers that Alaoji Power Plant and others will resume power generation as soon as gas supply is restored.

Share this:

  • Share
  • Click to email a link to a friend (Opens in new window) Email
  • Tweet
  • Click to share on Reddit (Opens in new window) Reddit
Alaoji 405MW Power Plant Shut Down As TotalEnergies Declare Force Majeure featured
orientalnewsng

Related Posts

$13Bn Trans-Saharan Gas Pipeline Gets Underway With Algeria Commencing Construction 

June 6, 2026

Dangote Refinery Expands Capacity To 700,000 Barrels Per Day

June 5, 2026

Chevron Expresses Commitment To Sustainable Environmental Development In Nigeria

June 5, 2026

Leave A Reply Cancel Reply

The latest
  • Shareholders Excited Over ₦4.39bn Dividend Payout By AIICO Insurance 
  • How Sanwo-Olu is selling Lagos as Africa’s gateway for investment
  • Sports, Unifying Tools Of Youths Against Internet Fraud-  Olukoyede 
  • Man Jailed 12-Years For Stealing N64 Million 
  • Moniepoint Group CEO Advocates For Credit-Led Growth Integration 
  •  FAAN Moves To Strengthen Sustainable Growth, Institutional Excellence 
  •  Nigerian Navy Confiscates Large Quantities Of Petroleum Products In Rivers State
  • Zenith Bank Plays Environmental Leadership With Lagos Clean Up Exercise
  • Proposed Electricity Act Amendment Bill In Limbo As SERC Rejects Move
  • Nigeria And China Discusses Investment Cooperation Across Economic Strata
Categories
Quick Links
  • About us
  • Terms of use
  • Privacy Policy
  • Disclaimer
  • Advertize here
  • Contact us
Facebook X (Twitter) Instagram YouTube LinkedIn
Copyright © 2026 Oriental News Nigeria. All right reserved.

Type above and press Enter to search. Press Esc to cancel.